Case Study

Maritime Electric

Utility: Maritime Electric
Location: Charlottetown, Prince Edward Island, Canada
Infrastructure Type: Wood Distribution Poles

Maritime Electric serves Prince Edward Island, where coastal weather exposure, wind loads, and aging wooden infrastructure present ongoing reliability challenges.

Maritime Electric wood utility pole reinforcement in Charlottetown, PEI for coastal storm resilience

The Challenge

Wood distribution poles in coastal Canadian environments face:

  • High winds and storm exposure
  • Moisture intrusion and decay
  • Structural aging
  • Increasing replacement costs

Full pole replacement is expensive and can strain capital budgets while creating service disruption.

Maritime Electric sought to evaluate whether composite reinforcement could provide immediate structural enhancement without replacing existing assets.

The Solution

GridWrap conducted a live demonstration installation on wooden utility poles in Charlottetown, PEI using DEMIRWRAP®

The field deployment included:

  • Rapid composite wrap installation
  • Immediate curing
  • Reinforcement of structurally aging wood poles
  • Evaluation by Maritime Electric personnel

The installation was completed seamlessly, with minimal disruption.

The Result

The reinforced poles demonstrated:

  • Immediate structural enhancement
  • Up to 10x increase in strength compared to the original pole condition
  • Extended service life potential
  • Added fire-retardant protection

By strengthening poles in place, Maritime Electric evaluated a smarter, cost-effective alternative to full replacement.

Scroll to Top