Case Study

London Hydro

Utility: London Hydro
Location: London, Ontario, Canada
Infrastructure Type: Concrete distribution poles

London Hydro is a municipally owned electricity distribution utility serving the city of London, Ontario. Responsible for maintaining a reliable electrical distribution network, the utility continues to prioritize infrastructure maintenance, system reliability, and the long-term performance of its assets.

The Challenge

Concrete utility poles are widely used in electrical distribution networks due to their durability, strength, and resistance to many forms of environmental deterioration. However, prolonged exposure to moisture, temperature fluctuations, freeze-thaw cycles, and mechanical stress can contribute to deterioration over time.

In climates such as southwestern Ontario, seasonal weather conditions create additional challenges for maintaining aging infrastructure. Concrete poles may experience cracking, surface deterioration, and corrosion of internal steel reinforcement when moisture penetrates the structure.
These conditions present several challenges for utilities:

  • Concrete deterioration — cracking and surface damage can compromise the protective concrete cover.
  • Reinforcement corrosion — moisture penetration may expose internal steel reinforcement to corrosion, potentially weakening the structure.
  • Freeze-thaw damage — repeated temperature fluctuations can accelerate existing cracks and deterioration.
  • Infrastructure replacement costs — replacing concrete poles can require significant labor, specialized equipment, and material expenses.
  • Service disruption — pole replacement may involve complex coordination around existing electrical infrastructure.

For London Hydro, the restoration project provided an opportunity to explore an alternative to conventional replacement for deteriorating concrete pole infrastructure.

The Solution

GridWrap’s composite reinforcement technology offers a potential approach to restoring and strengthening existing concrete utility poles without requiring complete infrastructure replacement.

The system is designed to provide external reinforcement to structurally compromised poles, supporting asset preservation and extending the useful life of existing infrastructure where engineering assessments determine restoration is appropriate.

The restoration approach focuses on:

  • Structural reinforcement — applying composite reinforcement to strengthen affected sections of the concrete pole.
  • Localized restoration — targeting areas of deterioration without replacing the entire structure.
  • Infrastructure preservation — retaining existing poles and reducing the need for extensive replacement activities.
  • Field adaptability — providing a reinforcement solution that can be applied directly to existing utility infrastructure.

By utilizing composite reinforcement technology, utilities can evaluate restoration strategies that address structural deterioration while minimizing the operational challenges associated with full pole replacement.

The Result

The London Hydro concrete pole restoration project demonstrates a potential application for composite reinforcement technology in the maintenance of aging concrete distribution infrastructure.

The Result

The approach is intended to deliver several benefits:

  • Structural rehabilitation — supporting the restoration of deteriorated concrete pole sections through external reinforcement.
  • Asset life extension — potentially extending the service life of existing infrastructure when restoration is technically appropriate.
  • Cost-effective maintenance — offering an alternative that may reduce the material, labor, and equipment requirements of conventional replacement.
  • Infrastructure resilience — supporting long-term maintenance strategies for distribution networks exposed to demanding environmental conditions.

The project offers a foundation for evaluating the use of composite reinforcement in concrete pole rehabilitation and its potential application across similar utility infrastructure.