FortisBC is one of British Columbia’s largest energy utilities, delivering electricity and natural gas to communities across the province. Its service territory spans a mix of urban centers and remote, forested regions, where wood pole infrastructure is exposed to fire risk, vehicle impact, and woodpecker activity over time.

The Challenge
A portion of FortisBC’s wood pole infrastructure has sustained damage from a range of causes common to forested, weather-exposed territories. Field poles reviewed for this project showed multiple, distinct damage types, from fire exposure to physical impact to pest activity.
This created a strategic challenge:
- Fire-damaged poles requiring evaluation
- Vehicle impact damage to pole structure
- Woodpecker holes compromising pole integrity
- Need for one repair approach across varied damage types
FortisBC required a way to evaluate whether composite reinforcement could restore structural integrity across these conditions without full pole replacement.



The Solution
GridWrap conducted a field demonstration of DEMIRWRAP® composite wrap reinforcement on a representative set of damaged poles, including a burned pole, an impact-damaged pole, and poles affected by woodpecker holes.
The deployment included:
- Field application of DEMIRWRAP® across multiple damage types
- Reinforcement of poles with varying diameters and damage severity
- On-site application observed directly by the FortisBC team
The demo was conducted to give FortisBC first-hand insight into application speed and performance under real field conditions.



The Result
The pilot demonstrated that composite reinforcement can:
- Address multiple damage types with a single repair system
- Be applied quickly and efficiently in the field
- Provide a faster, less disruptive alternative to full pole replacement
- Give utilities direct, on-site evaluation of performance before wider adoption