Case Study

EDP

Utility: EDP Brasil
Headquarters: São Paulo, Brazil
Region of Deployment: Vitória, Brazil

EDP Brasil is one of Brazil’s largest electric utility providers, serving millions across a country of more than 212 million people.

EDP Brasil concrete utility pole reinforcement project in Vitória for grid hardening and aging infrastructure

The Challenge

Field assessments identified severely deteriorated concrete utility poles, showing visible cracking and structural degradation.

Concrete poles, while durable, can suffer from:

  • Surface spalling
  • Longitudinal cracking
  • Reinforcement exposure
  • Reduced structural capacity

In high-load environments, this degradation can compromise reliability and increase the risk of failure — especially in rapidly growing urban and coastal regions like Vitória.

Full pole replacement would require:

  • Significant capital expenditure
  • Heavy equipment mobilization
  • Service disruption
  • Extended project timelines

The utility required a solution that could restore structural integrity in place without large-scale replacement.

The Solution

TThe GridWrap team deployed BULLWRAP® in-field.

Using BULLWRAP®, the damaged concrete poles were:

  • Cleaned and prepared
  • Structurally reinforced with high-strength composite wrap
  • Encapsulated to restore load-bearing capacity

Installation was completed on-site with no interruption to electrical service.

The Result

The reinforced poles achieved:

  • Restored structural performance
  • Increased resistance to further cracking
  • Extended service life
  • Avoidance of full pole replacement
  • Saved expensive cost of pole replacement

This approach allowed EDP Brasil to upgrade existing infrastructure efficiently while maintaining service continuity.